0.0977
7667766266
x

Talabira II & III Open Cast Coal Mine

iasparliament Logo
August 25, 2026

Prelims: Current events of national importance | Energy Infrastructure

Why in News?

The Talabira II & III Open Cast Coal Mine in Odisha, allocated to NLC India Ltd., recorded its highest-ever annual coal production of 19.14 million Tonnes (MT) in the financial year 2025–26.

Key Highlights 

  • Record Production - Produced 19.14 MT of coal and achieved a record annual dispatch of 17.69 MT in FY 2025–26.
    • Sector Allocation - 10.72 MT supplied to the power sector and 6.97 MT to non-regulated sectors.
  • Peak Output Metrics- Achieved a single-day production record of 1,26,138 tonnes (on March 21, 2026) and a monthly high of 3.39 MT in March 2026.
  • Power Sector Integration - Feeds key thermal power stations across India, including
    • NTPC Darlipali,
    • NTPC Gadarwara,
    • NTPC Khargone, and
    • NTPC Kudgi across states like Odisha, Chhattisgarh, MP, Karnataka, Tamil Nadu, and West Bengal.
  • Cumulative Output- Reached a cumulative production of 72.23 MT and cumulative dispatch of 70.89 MT as of August 2026.

Tech-Driven & Sustainable Mining Practices

  • Digital Logistics Management System (DLMS) - Uses
    • RFID-based vehicle tracking,
    • AI-enabled cameras, and
    • Automated gates,
    • Cutting entry-gate processing times from 1.42 minutes to 0.54 minutes per vehicle.
  • Advanced Extraction - Uses surface miners equipped with dust-suppression systems, 3D laser scanning with GNSS, drone surveying, and continuous ambient air quality monitoring.
  • Safety - Maintained a zero fatal accident record since inception and secured a 5-Star Rating under the Ministry of Coal's evaluation for 5 consecutive years (FY 2020–21 to FY 2024–25).

Talabira II & III Open Cast Coal Mine

About NLC India Limited & Coal Block Framework

  • NLC India Limited (NLCIL) - A Navratna Public Sector Enterprise under the administrative control of the Ministry of Coal, engaged in lignite/coal mining and power generation.
  • Established under - Coal Mines (Special Provisions) Act, 2015.
  • Aim - To manage the allocation and monitoring of coal blocks through transparent auctioning and nomination processes to ensure national energy security.

Reference

DD News | Talabira II & III coal mine

Login or Register to Post Comments
There are no reviews yet. Be the first one to review.

ARCHIVES

sidetext