0.1509
7667766266
x

National Security Guidelines

iasparliament Logo
August 10, 2026

Prelims: Current events of national and international importance | Security

Why in News?

The Ministry of Home Affairs (MHA) has issued new national security guidelines.

  • It was introducing a blanket ban on projects like solar, wind and hybrid renewable energy projects within 1 km of the international border and mandating security clearance for projects located up to 50 km away.
  • The border areas include the Line of Control (LoC), the Line of Actual Control (LAC) and the International Border (IB).
  • Projects proposed within 20 km of the LoC, LAC and IB will also require a separate No Objection Certificate (NOC) from the Ministry of Defence.
  • Applications for all renewable energy projects will be submitted only to the Ministry of New and Renewable Energy (MNRE).
  • The guidelines impose restrictions on foreign participation and staffing.
  • It was stating that the applicants should not engage engineers, staff, employees, or labour from Pakistan, Bangladesh and China without the MHA’s permission.
  • Existing renewable energy projects near the LAC are mostly small-scale in nature, while those near the IB in Rajasthan and Gujarat are relatively large.
  • In Jammu and Kashmir, along the LoC, most projects are solar rooftop installations, while Kargil and Ladakh have solar photovoltaic projects.

Reference

The Hindu | National Security Guidelines

Login or Register to Post Comments
There are no reviews yet. Be the first one to review.

ARCHIVES

sidetext