Why in News?
The Indian Space Research Organisation (ISRO) began the ‘stacking,’ or assembly, of HLVM3 at the Satish Dhawan Space Centre, Sriharikota.
- It is the 1st of 3 un-crewed test missions that will lead up to India’s maiden human spaceflight.
- Aim – To mimic - end to end - the actual flight and validate critical technologies and capabilities including the Human-rated Launch Vehicle Mark-3 (HLVM3).
- Activity – It will place the orbital module in a 170 km x 430 km elliptical orbit around the earth.
- Once the orbital module de-orbits, the crew module will separate for controlled re-entry into the earth’s atmosphere and splashdown in the Bay of Bengal
December 18, 2024 coincides with the 10th anniversary of the sub-orbital Crew Module Atmospheric Re-entry Experiment (CARE) mission of 2014.
- HLVM3 – Human rated launch vehicle, HLVM3, is derived from LVM3 and designed with enhanced reliability to meet human safety considerations.
- It is a 3-stage vehicle with a payload capacity of about 10 tonnes to LEO.
- The vehicle is 53 meters tall and weighs 640 tonnes.
- Orbital module components – The service module and the crew module together make up the orbital module
- The crew module is progressing at the Vikram Sarabhai Space Centre, at Thumba in Kerala.
- Once the crew module is ready, it will be transferred to the U.R. Rao Satellite Centre (URSC), Bengaluru, for integration with the service module.
- After a series of tests including thermo-vacuum tests at the URSC, the orbital module will be transported to Sriharikota to be placed aboard the launch vehicle.
- The crew module is connected to the crew escape system which is placed at the very top.
|
Orbital Module Components
|
Launch Vehicle components
|
- Service Module
- Crew module
|
- S200 solid rocket boosters
- L110 liquid stage
- C32 cryogenic stage
|
References
- The Hindu| Integration of Components of Gaganyaan G1 Mission
- ISRO| HLVM3